Laserfiche WebLink
<br /> <br />PART I <br />Page 7 of 19 <br />E. SPECIAL REQUIRF2lEYTS <br />1. :~aterials Containment Plaa (Continued) <br />e) Aa implementation schedule for additional facilities which might <br />be required in item c, but which are not yet operational; <br />f) A List of available outside contractors, agencies, or other <br />sources which could be utilized La the event of a spill in order <br />to clean up its effects. If the facility is capable of handling <br />spills ia-house, this shall be documented in the plan; <br />g) Provision far yearly review and updating of the contingency plan, <br />plus resubmission of the plan to the Division if conditions and'/or <br />procedures at the facility change the original plan. <br />The foregoing provisions shall is no way render inapplicable those <br />requirements imposed by Section 311 of the Water Pollution Control Act <br />Amendments of 1972, regulations promulgated thereunder, the Colorado <br />Water Quality Control Act, and regulations promulgated thereunder. <br />This play should be prepared by a professional engineer registered is <br />the State of Colorado. <br />Nothing herein contained shall be construed as allowing nay discharge <br />to waters of the State other than through the discharge points <br />specifically authorized in this permit. Yothiag herein contained <br />shall be construed as ezcusing nay 11abi11cy the permittee might have, <br />civil or criminal, for nay spill. <br />The submittal of a Spill Prevention Control and Counteraeasure Plan <br />(SPCC Plan) as required by 40 Ce^R Part 112 may satisfy all or part of <br />this requirement. Should additional materials ezist on site which are <br />not addressed is the SPCC Plan, addressing those materials as per tae <br />above is required. <br />Code: 1 - 21 Dace:' L-84, revised 12-d8 <br />