Laserfiche WebLink
TABLE OF CONTENTS <br />VOLUME VII - GEOTECHNICAL STUDIES <br />1. Introduction <br />2. Preliminary Geotechnical Engineering Study -July 10, 1996 <br />3. Additional Geotechnical Study -Evaluation of Reclaimed Slopes -October 10, 1996 <br />4. Additional Stability Analyses -Road Cuts and Topsoil Pile -January 7, 1996 <br />5. Geotechnical Laboratory Testing -Proposed Gob Pile -January 7, 1997 <br />6. Maps VII-1 & 2 Section & Bore Hole Locations <br />7. Expansive Soil Evaluation -Reclaimed Fill Slopes -January 31, 1997 <br />8. Additional Geotechnical Investigation -Coal Mine Waste Bank -February 12, 1997 <br />9. Geotechnical Engineer Report -Slope Stability Analysis - PR-03 - Terracon - 6!2/99 <br />10. Geotechnical Engineering Study, Coal Preparation Facility, August 11, 2003 <br />Geotechnical Engineering Study, B-Seam Portal Bench, July 30, 2003 <br />TR-027 vii 08/03 <br />ApPROVGD <br />8/22, o~ <br />