Laserfiche WebLink
iii iiiiiiiiiiiii iii <br /> s99 <br />Interoffice MEMORANDUM <br />to: File C-81-025 Quarterly P nd Inspection Reports <br />from: Byron G. Walke~ <br />subject: Review of 1st Quarter 2001 Sedimentation Pond Inspection Report <br />Permit: C-81-025 <br />date: December 3, 2001 <br />The subject report was submitted on April 13, 2001, and received at the Division on April l8, <br />2001. The inspection was conducted on March 19, 2001. This review is conducted to determine <br />compliance with Rule 4.05.6(13). <br />Was the pond inspected for structural weakness? <br />Was the pond inspected for erosion? <br />Was the pond inspected for other hazardous conditions? <br />Is [he report certified by a registered engineer? <br />Is the sediment level reported? <br />Is required maintenance reported? <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes <br />None Known to be Required <br />