Laserfiche WebLink
TYPE OR PRINT CLEARLY <br />14. Present land use Pasture land <br />(i.e., agricultural, industrial, etc.} <br />15. Proposed future land use Pasture land-. ",__ <br />(Goal of reclamation) <br />INSTRUCTIONS: This application form must be submitted in duplicate and each form must <br />be accompanied by the following information and items. The application <br />will not be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 (for Special 10-day) for additional guidance. <br />ERFIIBIT A - Legal Description <br />The legal description moat identify the affected land and be wholly adequate for <br />field location of the property. It can be is the form of metes and bounds survey <br />or a description by reference to township, range, and section to at least the <br />aeareat quarter quarter section. Where applicable, the street address or lot <br />number(s) may be used. <br />E}03IBIT B - MiniaB Plan <br />This eaa be a general discussion of the methods, equipment, phases or stages of <br />the operation and those portions of land affected by each. The plan should be <br />closely correlated with the map and should show where extraction will begin, which <br />direction it will proceed. <br />EIDIIBIT C - Map <br />This map should be as comprehensive as possible is *_ezms of clearly defining <br />tha permit boundazies and indicating all roads or stockpile areas to be used in <br />connection with the operation. All immediately adjacent landowners must be shown. <br />The closest quarter section corner, section line, or any other locateable point <br />should also be shown oa the map. <br />E7giIBIT D - Wildlife, Water Resources, Vegetation and Soils Information <br />Each of the above-mentioned subjects must be addressed as outlined is the <br />applicable Rule, under item number ten (10). <br />EX$IBIT E - Reclamation Plan <br />Aa with the mining plan, this should be a general discussion of the methods, <br />equipment, phases or stages of the reclamation process and those portions of <br />laced affected by each. If possible, the plan should be closely correlated <br />with the map. If nod, tha narrative moat be comprehensive enough to draw an <br />accurate verbal picture of the expected physical appearance of the area after <br />completion of reclamation. <br />E7UiIBIT F - Proof of Local Government Approval <br />This must be a Letter from the local government specifying conformance with <br />existing zoning regulations. <br />ERHIBIT G - Source of Legal Right to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tan <br />_ receipt. In lieu thereof, a statement acknowledged by a notary public that <br />the operator has the legal right to enter and-mine will be .accepted. <br />**FOR SPECIAL 10-DAY PERMITS ONLY** <br />ERBIBIT B - Reclamation Costs <br />If the surety is requested to be less than $2500, the operator must submit <br />facts to support such request. Otherwise a surety of $2500 will automatically <br />be set. <br />ERRIBIT I - Terms of Governmental Contract <br />The operator must submit a copy of the contract or other proof that proves the <br />necessity of a special 10-daq permit. The operator must also submit evidence <br />of the surety provided under the governmental contract, if it was required. <br />