My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70649
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70649
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:56 PM
Creation date
11/20/2007 11:27:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999005
IBM Index Class Name
Permit File
Doc Date
5/20/1999
Doc Name
HEARING PROCESS ALL RITE PAVING & REDI MIX NORTH RIVER PIT 112 RECLAMATION PERMIT APPLICATION FN M-9
From
DMG
To
OTERO CNTY COMMISSIONERS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmenl of Natural Resources <br />1711 Sherman SL, Room 21 5 <br />Denver, Colorado 80203 <br />Phone: U03) 866.356: <br />FA%: 1303) 832-8106 <br />May 20, 1999 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />HININ G•SAFErY <br />gill Osvens <br />Gmernor <br />Grcl; E. watcher <br />Jim and Opal Hollenback Esecmrve Dueclor <br />215 Trail Road Michael B. Lonp <br />La Junta. CO 81050 D~~~slo~ Dueclar <br />RE: Hearing Process, All Rite Paving and Redi-Mis, North River Pit, 112 Reclamation Permit <br />Application, File No. NI-99-005 <br />Dear Mr. & Mrs. Hollenback: <br />The Division has received objections to approval of All Rite Paving and Redi-Mix, Inc.'s 112 reclamation <br />permit application for their proposed North River Pit sand and gravel mining operation. When timely <br />objections to an application are received by the Division, a three step hearing process is initiated. <br />The first step, an Informal Conference, was held in La Junta on May 14, 1999. The next part of the process <br />will be aPre-Hearing Conference conducted by a representative of the Colorado Mined Land Reclamation <br />Board. The date for that conference will be determined after the board selects a Conference Officer at its <br />May 27-28, 1999 meeting. Under [he present application review schedule, the date will be between <br />June 4, and June 14, 1999. I will inform you of the date, time and place as soon as possible. At the <br />conference, the Conference Officer will develop a Draft Order for the full Board to consider in conducting <br />the final Formal Public Hearing, on the application. <br />The Formal Public Hearing, under [he present permit application review schedule, will be held during the <br />Board's June 22-23, 1999 meeting, in room 318, 1313 Sherman Street, Denver, Colorado. You should call <br />the Division office June 18'" or 21~' to find out which day the hearing will be held. <br />Prior [o the Pre-hearing Conference the Division will send its recommendation regarding approval or denial <br />of [he application and the rationale supporting the recommendation to the Board and all parties [o the <br />hearing process. <br />Please call if you have questions. <br />Sincerely, <br />Larry Oehler <br />Environmental Protection Specialist <br />cc: Jim Stevens, DMG <br />\~SVeaTalk\FSShareJFilesf AILC DNR AI L\OSSIPAIAI6N ERG E\rormsWearine Procrss.IJo Juo <br />
The URL can be used to link to this page
Your browser does not support the video tag.