My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70649
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70649
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:56 PM
Creation date
11/20/2007 11:27:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999005
IBM Index Class Name
Permit File
Doc Date
5/20/1999
Doc Name
HEARING PROCESS ALL RITE PAVING & REDI MIX NORTH RIVER PIT 112 RECLAMATION PERMIT APPLICATION FN M-9
From
DMG
To
OTERO CNTY COMMISSIONERS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-3567 <br />FAx: IJ03) 832-8106 <br />May 20. 1999 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MI NING•SAFETY <br />Bill Owens <br />Govemar <br />Greq E Wal<her <br />Mr. Terry E. Menges ExecuVVe DireUOr <br />.310 Trail Road Michael B. Long <br />La Junta, CO 81050 Division Director <br />RE: Hearing Process, All Rite Paving and Redi-Mix, North River Pit, 112 Reclamation Permit <br />Application, File No. NI-99-005 <br />Dear Mr. Menges: <br />The Division has received objections to approval of All Rite Paving and Redi-Mix, Inc.'s 112 reclamation <br />permit application for their proposed North River Pit sand and gravel mining operation. When timely <br />objections to an application are received by the Division, a three step hearing process is initiated. <br />The first step, an Informal Conference, was held in La Junta on May 14, 1999. The next part of the process <br />will be aPre-Hearing Conference conducted by a representative of the Colorado Mined Land Reclamation <br />Board. The date for that conference will be determined after the board selects a Conference Officer at its <br />May 27-28, 1999 meeting. Under the present application review schedule, the date will be between <br />June 4, and June 14, 1999. I will inform you of [he date, time and place as soon as possible. At the <br />conference, the Conference Officer will develop a Draft Order for. the full Board to consider in conducting <br />the final Formal Public Hearing, on the application. <br />The Formal Public Hearing, under the present permit application review schedule, will be held during the <br />Board's June 22-23, 1999 meeting, in room 318, 1313 Sherman Street, Denver, Colorado. You should call <br />the Division office June l8'" or 21~` to find out which day the hearing will be held. <br />Prior to the Pre-hearing Conference the Division will send its recommendation regarding approval or denial <br />of the application and the rationale supporting the recommendation to the Board and all parties to the <br />hearing process. <br />Please call if you have questions. <br />Sincerely, <br />~.~~~1'.~'r! <br />Larr~ler <br />Environmental Protection Specialist <br />cc: Jim Stevens, DMG <br />VS Veer TalA\FSSharJFilesC AIL@DNRM1IL\OSSU'MMVU ERGEVDrmsViearin¢ Pro.ess.IJo Jw <br />
The URL can be used to link to this page
Your browser does not support the video tag.