Laserfiche WebLink
• III IIIIIIIIIIIII III <br />999 <br />P.O. Box 1887, 702 Gregg Drive, Buena Vista, CO 81211 <br />Ph. 17191 395-3790 <br />August 6, 2001 <br />Colorado Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Attention: Larry Oehler <br />Subject: Conditions for final approval <br />Dear Mr. Oehler <br />Fax 1719) 395-3794 <br />FiECIE"'~"~~ <br /> <br />Division of Minerals and Geelogf: <br />We have reviewed the response from Michael Graber of Water Division 2 and your proposed conditions of <br />approval and have the following to submit for final approval. <br />We will maintain the quarry highwall as proposed by Mr. R. J. Irish's report and your Condition No. I in <br />your letter dated August I, 2001. Cut slopes will be benched 10 fee[ wide and 20 feet high. The back wall <br />ofeach bench will be drilled and blasted to produce a .25h:1v slope. If, due to drilling equipment that can <br />only produce a lesser amount of depth other than 20 feet, a 10-foot bench will still be maintained, thus <br />producing a flatter slope. <br />We will follow the blasting recommendations as proposed by Mr. Gordon Revey in his evaluation end per <br />yow Condition No. 2 of your letter of August 1, 2001. Maximum charge weight of 42 pounds per delay <br />and delays of 9 milliseconds w more will be used. All blasts will be monitored by seismograph placed at <br />the base of the dam on bedrock. Frequencies will be limited to less than 30 Flz and Peak Particle Velocities <br />will not excced 2.0 ips. <br />In addition, we will read the piezometers before and after each blast as well as measuring the seepage from <br />the dam before and after. A visual inspection will also be conducted ofthe dam itself. <br />All of this data will be recorded and kept by us for inspection by the DMG and Michael Graber of Water <br />Division 2. <br />Thank you for you time and assistance in this mattes. Please do not hesitate to contact us if you have any <br />questions of comments. <br />Project Manager <br />RECcIVEC <br />pUG 0 8 2001 <br />Division of Minecals and Geolo9Y <br /> <br />