Laserfiche WebLink
~OLOWYO COAL COMPANY <br />2000 MID TERM REVIEW - TR - 57 <br />RECLAMATION BOND CALCULATION <br />SUMMARY OF LOSTS FACILITIES AREA <br />Rvel inn <br />FaUlAiea Area DlsNrbannw <br />Total Reva9elallon Cos19 <br />Summary al All Activaiea <br />777C Haul TNUs <br />992D Loetler <br />D10N Dozen <br />677E Saapen <br />14G Motaryratler <br />9000 Gelbn Walar Trvck <br />Overourden Drills <br />Dovmlwle Service <br />Fx11i0ea Removal <br />• ONer Support Equipment <br />Revegatallon <br />Stockpile Rsmavel <br />Otnar CMLRD Stipulated Cosa <br />Total All Dtren Costs <br />Contradar OVemead ProlM antl Atlministralive <br />Publk Lisblliry Inwrance <br />PMOrmsnce Bontl <br />Jab SupeMSion <br />Mahilizalion and Demobilization <br />Conbadar PmfA <br />Subtotal Conbarlor Intlirocl Costs <br />TABLE 5 <br />REVISED FEBRUARY 15, 2001 <br />Loose Bank Equip Cast Trnal <br />Yards Verde Hours per HOUr Coal <br />(Lry) (Bry) (hours) (Smr.) (f) <br />3129,49fi <br />238,903 206,859 1.343 3169.39 3214,091 <br />278,903 206,859 286 (184.72 92,772 <br />1,271,814 1,017,467 1,718 5788.27 5262,092 <br />620,264 939,380 2,280 3121.39 5276.714 <br />0 0 841 3179.40 (90,377 <br />0 0 421 597.18 319,671 <br />0 o D stzsoo so <br />0 0 0 30.14 SO <br />0 0 0.0 30.00 51,276,108 <br /> 336,049 <br /> 5129,496 <br /> 549,496 <br /> 50 <br /> <br />2,170,981 1,767,fi80 6490.4 52,298,960 <br />339,W4 <br />324,139 <br />336,797 <br />399,006 <br />3229.896 <br />3780,872 <br />PmjxJ Adminiseatlon Costa ' <br />CMLRD Atlministrellva Coate 527,694 <br />Contrail Propsnlion Feea 366,996 <br />Subtotal AtlminlsVnlve Intlired Cost+ 590,690 <br />Subtotal All Retlamalion Bontling Costs (2,770,722 <br />Phase II end Pheae III Bontling Release f0 <br />.TOTAL ALL COLOWYO RECLAMATION BOND 52.770,722 <br />