Laserfiche WebLink
These amounts reflect the utilization of the most accurate and current information available <br />• to estimate the cost which would be incurred by the MLRD in the unlikely event that Colowyo <br />could not meet the reclamation obligation under the existing approved permit during the next five- <br />yeaz term. The costs for the various tasks associated with the bond reclamation activities aze <br />summazized in Tables 2 through 6. <br />• <br />• <br />i2 <br />