Laserfiche WebLink
<br />,~ db~, c~ w <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Divisbn of Water Resources <br />Deparenent of Naltaal ResOWtes , <br /> <br />` <br />' <br /> RECEIVED •. <br />i~ ~ <br />[313 Boatman Street. Room 518 . ~~. <br />' <br />Darner. Cotaraao 50203 ~`EB 26 2001 . <br />~'t.,.:~ <br />Poona (303) 5%-3581 <br />FAX (303186&3559 <br />Divisio f Reclamation, <br />nap:Mxwr.waar.sbu.w.~* ing and Safety tun Rinr. Jr. <br />Governor <br />DATE: February 26, 2007 E„~eQ„we o rec~mr <br />TO: David A Bird, Environmental Protection Specialist ~ D. Stmµwn, P.E. <br /> Sma Enpnax <br />CC: Division 2 Office; DisVict 19 Water Commissioner <br />FROM: Clay Kimmi, P.E. <br />RE: Mooney Hills Permit, File No. M-2007-007 <br />Operator: Mullet Excavating <br />Contact: Myron Mullet (719) 783-205ti <br />Section 25, Twp 325, Rng 62W, 6th P.M., Las Animas County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a welt permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 fee[ of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />~MMENTS: <br />