Laserfiche WebLink
• TABLE 11 <br /> RECLAMATION OF CURRENT ACTIVITIES <br /> ACTI VITY REFERENCE CALCULATION COST <br /> I. Use 1987 D9L Dozer to Calc 11-1 $ 7,050 <br /> Push South end of Pit <br /> to it and 3:1 Slope <br /> II. Shoot East Highwall to Calc [I-2 $ 27,778 <br /> Rough Grade to 3:1 Slope <br /> III. Rough Grade East Highwall Calc 11-3 $ 14,100 <br /> IV. Rough Grade North End Calc II-4 $ 5,640 <br /> of Pit <br /> V. Smooth Grade all of Pit Calc II-5 $ 750 <br /> VI. Topsoil Pit Calc 1[-6 $ 19,760 <br />• <br /> VII. Mulch, Net, Seed Pit Calc II-7 $ 20,850 <br /> VIII. Reseed & Misc Estimated 1$ 0.000 <br />TOTAL <br />• <br />$105,928 <br />.IAN 1o- t^`: <br />