Laserfiche WebLink
• TABLE Ill <br />RECLAMATION OF MAXIMUM OPEN PIT AT SOUTH END <br />u <br />• <br />ACTIVITY REFERENCE CA[_CULATION <br />I. Use 1987 D9L Dozer to II[-1 <br /> Smooth South end of Pit <br />II. Shoot 700,000 BcY in East 111-2 <br /> Highwall Cast Blast to Pit <br />III. Rough Grade East Highwall II[-3 <br />IV. Rough Grade North End III-4 <br /> of Pit <br />V. Move Fill Materials to West of Pit 111-5 <br />VI. Smooth Grade all of Pit III-6 <br />VII. Topsoil 25 acres III-7 <br />VIII. Mulch, Net, Seed 1[I-8 <br />TOTAL <br />COST <br />$ 16,920 <br />$ 71,400 <br />$ 31,725 <br />$ 11,280 <br />$139,920 <br />$ 1,125 <br />$ 56,810 <br />$ 54,125 <br />$383,305 <br />JAN 1 5 1993 <br />