Laserfiche WebLink
• II-4 Rough Grade North Pit Calculation <br />1987 D9L <br />To: Rough Grade North end of pit. Estimate of 25,000 LCY material at north <br />pit to rough grade. <br />Push distance 200 feet <br />700 LCY/Hour production <br />So: 25,000 LCY _ 700 LCY/Hour = 35.7 Hour <br />Use 40 Hours at $141/Hour <br />COST: 40 Hours at $141/Hour = 5640 <br />II-5 Smooth Grade All of Pit <br />14G Grader <br />To: Smooth grade all of pit and reduced highwalls. Estimate area at IS acres total. <br />Use 14' blade - 2nd gear = 3.3 mph <br />3.3 mph = 17,424 Fph <br />So: 17,424 Fph x 14' blade = 243,936 ftz/Hour at 50% effective use - 121,968 ftZ/Hour <br />Then: 15 acres = 653,400 ft2 <br />• time =653,400 ft2 - 12],968 feet/Hour = 5.36 Hours <br />Use 10 Hours at $75/Hour <br />COST: 10 Hours at $75/Hour = 75 <br />1[-6 Topsoil Calculation <br />637E PP <br />To: Topsoil 15 Acres at 1.0 feet deep needs 24,200 LCY topsoil. <br />Cycle Time <br />Load & Dump <br />Cycle <br />- 1.6 Minute <br />- 4.0 Minim <br />TOTAL 5.6 Minute <br />Then: 5.6 Minutes to Cycle for 31 LCY <br />So: 24,200 LCY _ 31 LCY = 780.6 Loads <br />Use 800 Loads. 800 Loads at 5.6 min/load yields 448.0 minutes <br />or 74.6 Hours. Use 80 Hours at $247/Hour <br />• COST: 80 Hours at $247/Hour = 19 760 <br />,SAN 1 5 1393 <br />