My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29751
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:38 PM
Creation date
11/20/2007 11:25:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
9/30/1996
Doc Name
3rd Qtr 1996 INSPECTION
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ ...__~. <br />_•1, <br />~:._:. BASIN RESOURCES, INC. <br />.--,[~ SEDIMEN,//TATION POND INSPECTION FORM <br />Pond ~~/~,r,,,,,ryt,,,_~,L~ayr,~ Q~~ SCJ NPDES No. <br />Date of Inspection ,r_,,,, ,~, ~?O J9l <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, Moderate, Fe Poor <br />2. Erosion forming gullies: Extensive, Some, ery Few, None <br />7. Is wave action causing erosion: <br />On the upsveam embankmen[7 Yes No ~~ <br />At the principal spillway inlet? Yes No <br />4. Erosion of the downstream toe of the embankment? Yes No C/ <br />The cause of the erosion is attributed to: <br />5. s seepage occurring through the dam? Yes ___ No ~!_ <br />Could this seepage cause potential instability? Yzs ___ Nn <br />Explain: ~- ___ <br />PRINCIPAL SPILLWAY ~ernrrlu~' .'+i ~~~~'~'~ <br />1. Is the principal spillway system in working order? Yes No <br />2. Is the inlet free of debris and restrictive material? Yes No <br />3. Is the discharge outlet free of restrictive material? Yes No <br />4. Is erosion occurring at the discharge outlet?. Yes No <br />Evaluate [he severity: E~Tensive Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge? <br />Yes No <br />2. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />Yes No <br />3. Is erosion occurring at any section of the emergency spillway? Yes No <br />Describe the e.~ctent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design stoff{j~~ge capacity of the rese~'otr b~en~surpassed? Yes No ~- <br />Ifyes, explain: ,Y~l~ ~,•.ru c ~ ~~n,/.r~„ ~tt, Z~ ~ ~X!'ea~/ S <br />Please add any special comments concemiog potentially dangerous pr blems on the bacl f this <br />sheet! <br />Inspected by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.