My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29751
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:38 PM
Creation date
11/20/2007 11:25:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
9/30/1996
Doc Name
3rd Qtr 1996 INSPECTION
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- .I /. <br />. . ._ ~.__ <br />~ / <br /> y <br />' <br /> . <br />, <br />Pond, <br />Date of <br />PDES No. O~ <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, oder Few, Poor <br />2. Erosion forming gullies: Extensive, Some, pry Fe None <br />3. Is wave action causing erosion <br />On the upstream embankment? Yes No ` <br />At the principal spillway inlet? Yes No ~ <br />4. Erosion of the dovvnsveam toe of the embankment? Yes No y <br />-The cause of the erosion is attributed to: <br />5. Is seepage occurring tluough the dam? <br />lbuld this seepage cause potent;, I instability? <br />PRINCIPAL SPILLWAY <br />Yes No <br />Yes A`o <br />Yes y No <br />Yes ~~ No <br />Yes / No <br />Yes No <br />Moderate Just Starting None <br />I 1. Is [he principal spillway system in working order? <br />2. [s [he inlet free of debris and restrictive material? <br />3. Is the discharge outlet free of restrictive material? <br />4. Is erosion occumng at the discharge outlet? <br />Evaluate the severity: Extensive <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge <br />Yes ~ No <br />2. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />Yes No <br />3. Is erosion occurring a[ any section of the emergency spillway? <br />Describe the extent: <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Yes No ~~ <br />SEDIMENT STORAGE CAPACITY ~- <br />1. Has the design storage capacity of the reservoir been surpassed? Yes No <br />If yes, explain: <br />Please add any special comments concerning potentially dangerous obl ~on t bacl f this <br />sheetC <br />Inspected by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.