Laserfiche WebLink
J tea. <br />BASIN RESOURCES INI. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond NEW ELK MINE NPDES No NE-006 <br />DATE OF Inspection ~/~,~„~15y~ <br />EMBANKMENT ~f <br />1. Adequacy of vegetative cover: EXCELLEN MODERATE, FEW, POOR. <br />2. Erosion forming gullies: EXTENSIVE, SOME, VERY FEW, NON <br />3. Is wave action causing erosion <br />On the upstream embankment ? YES NO~ <br />At the principal spillway inlet YES_N0~1/pt/L~ <br />4. Erosion of the down stream toe of the embankment? YES_NO~ <br />The cause of the erosion is attributed to <br />5. Is seepage occurring the dam ? YES N0~ If yes could this <br />seepage cause potential instability ? YES_N0~ <br />Explain: <br />PRINCIPAL SPILLWAY <br />1. Is the principal spillway system in working order ? YES_NO A/~£ <br />2. Is the inlet free of debris and restrictive material? YES~NO_ <br />3. Is the discharge outlet free of restrictive material? YES NO,f/O~ <br />~1iU"'£ <br />4. Is erosion occurring at the discharge outlet? YES_NO_if es <br />Evaluate the severity: EXTENSIVE MODERATE JUST STARTING ONE <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? YES_NO ~/r9n/~ <br />2. Does it appear as if the emergency spillway has discharged has <br />water since the last inspection? YES_N0~ <br />3. Is erosion occurring at any section of the emergency spillway? <br />YES NO x Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />YESNO~If yes, Explain: <br />Please add any special comments concerning potentially dangerous <br />problems on the back of this sheet. <br />INSPECTOR ~ +~ <br />