My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29742
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:38 PM
Creation date
11/20/2007 11:24:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Hydrology
Doc Date
1/3/1983
Doc Name
SOMERSET MINE EXPLORATIN DRILLING PERMIT APPROVED JUNE 1 1982
From
US STEEL MINING CO INC
To
MLR
Permit Index Doc Type
OTHER GROUND WATER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ <br /> <br />WESTERN DISTRICT <br />v V Box Bnr <br />EAST C~RaON. UTAH 8520 <br />B01 ~ OtlB~+UI <br />January 3, 1983 <br />n <br />LJ <br />Mined Land Reclamation <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Mr. Liddle: <br />Attn: Robert Liddle <br />Reclamation Specialist <br />U. S. Steel <br />uss Mining Co., Inc. <br />a Subtldlary of United Stiles Steel Corporetlon <br />III IIIIIIIIIIIIIIII <br />9~ <br />Re: Somerset Mine <br />Exploration Drilling Permit <br />Approved June 1, 1982 <br />On September 24, 1982, U. S. Steel 14ining Co., Inc. completed the ex- <br />ploration drilling covered by the subject permit. Six holes were drilled <br />from the drill site which is located on Map C8-1275. Two of these holes <br />were drilled along an existing road. Four holes were drilled in a pad <br />which was constructed west of the existing road as shown on Map A8-1416. <br />Construction of the drill pad included the following: <br />1. Removal and storage of <br />2. Grading to level an are <br />long by 15 feet wide. <br />3. Excavation of five mud <br />approximately six feet <br />4. Installation of fences <br />topsoil. <br />'a that was approximately 115 feet <br />pits and two trenches which were <br />deep. <br />around the mud pits and trenches. <br />Each drill hole was drilled 12', inches in diameter in overburden and <br />then continued 8 7/8 inches in diameter in rock to a depth of approximately <br />500 feet. The holes were cored with a six inch core barrel to a depth of <br />approximately 530 feet. All drill holes have been plugged full depth with <br />cement. <br />Because of poor weather following the completion of drilling and tlTe <br />lack of equipment available to perform the work, Somerset Mine was unable to <br />reclaim the drill site. The reclamation of the drill site will be completed <br />in the spring of 1983. Upon completion of reclamation, U. S. Steel Mining <br />Co. will submit a report describing the work performed. <br />Sinc re , <br />/ ~/, <br />R. E. You ston <br />General Superintendent <br />cs <br />cc: d. R. Watts <br />W. P. Reitze <br />
The URL can be used to link to this page
Your browser does not support the video tag.