My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70535
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70535
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:45 PM
Creation date
11/20/2007 11:24:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003037
IBM Index Class Name
Permit File
Doc Date
9/18/2003
Doc Name
Preliminary Bond Calculations
From
DMG
To
Banks and Gesso LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />C(:RAPFR _ r1N1 Y WARK <br />Task # <br />Date <br />User <br />Agency or organization name : DMG <br />01a State :Colorado <br />09/172003 County:Montrose <br />GRM Site:HaldorsonSand/Gravel Mine <br />Pertntt or other job action :Place overburden from Phase 5 on Phase one for final contour <br />task description :Place overburden from Phase 5 on Phase 1 for final contour <br />~r ~ .~. 4.~'p;'-°'" ~ „'"i "'"€'^'~ '~-~'z~ -w?x.a. E2K~` k.T ~,kr ~ _,Y,a~ " ':: nv. 1 r 3x«.it,. : 2 :..~, t" r~+k ~`a e,4;.:: <br />HOURLY EQUIPMENT COST <br />Model :Cat 633E Series 2 <br />Cost Breakdown : Job utilization <br />Ownership wsVhour : $67.49 NA <br />Operating cosUhour: $107.58 100 <br />Operator cest/hour: $25.43 NA <br />Total unit cosVhour : $200.51 Total Reet cosVhour <br />MATERIAL QUANTITIES <br />Initial <br />volume: 183,920 LCY <br />Shin basis : 1 per day <br />Horsepower : 490 <br />Weight (UST) : 56.34 <br />Cost data source : (CRG) <br />$802.02 <br />Swell Loose <br />factor: NA volume: 183,920 LCY <br />Source of quantity take-off :28.5 acres of Phase 5 X 43560/27 X 4 feet average depth <br />Source of estimated swell factor:NA <br />HOURLY PRODUCTION <br />Haulinc Capacity <br />Basis <br />Material weight: 2,900 pounds/LCY <br />Material description <br />Decomposed rock-50% Rock,50% Earth <br />' Rated payload : 82,000 pounds <br />Payload capacity : 28.28 LCY <br />Cvcle Time (load + haul + spread + return) <br />Travel time <br />Scraper Bowl (volume) Basis <br />Struck volume : 23.20 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 28.60 LCY <br />Adjusted capacity : 28.28 LCY "` <br />Loading time: 0.90 minutes' <br />Maneuver and spreading time : 0.70 minutes <br />loadlrq time per pair an puaFWUII motlels <br />Route Distance (feet) Grade (%) Roll. res.(°A) Total res.(%) Velocity (fpm) ~ Travel time (min.) <br />Haul: 1,800 0.0 3.0 3.0 2,173 0.83 inutes° <br />Return: 1,800 0.0 3.0 3.0 2,999 0.60 minutes" <br />"trevel time atljusted far acceleration and tleaeleretion et bad antl dump points <br />veloUtiea ere max attainable per total reaiatance shown, trot everepe <br />Job Condition Correction Factors <br />Site attitude (feet) : 5,800 <br />Altitude adjustment factor : 0.96 (Cat HB) <br />Job efficiency factor : 0.83 (1 shifUday) <br />correction factor : 0.80 <br />Total cycle time : 3.03 minutes <br />Adiusted Houdv Production <br />Unadjusted unit production : ~ 560.19 LCY/Hour"' <br />Adjusted unit production : 446.36 LCY/Hour <br />Adjusted fleet production : 1,785.43 LCY/Hour <br />' 2 times volume on push-pull motlels <br />JOB TIME AND COST <br />Fleet 5¢e : 4 Scraper(s) Total job time : 103.01 Hours <br />Unit cost : $0.449 /LCY Total job cost : $82, 818 <br />Pertnit/job # : M-2003-037 <br />Abbreviation :none <br />Filename : M037-01 a <br />
The URL can be used to link to this page
Your browser does not support the video tag.