My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29734
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:38 PM
Creation date
11/20/2007 11:24:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Hydrology
Doc Date
5/10/2006
Doc Name
Water Supply Plan Approval
From
OSE
To
Leaf Engineering
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Forrest Leaf <br />May 9, 2006 <br />Page 4 <br />5. Approval of this plan is for the purposes as stated herein. Any additional uses of this <br />water must first be approved by this office. <br />6. The Water Commissioner responsible for the administration of this plan is Mr. Scott <br />Edgar, 1735 Delores River Drive, Windsor, CO 80550, phone number (970) 686-0628. <br />The applicant shall maintain daily records of all diversions, replacements, and the <br />amount of water used for each particular purpose. The applicant shall provide a report of <br />these records to the division engineer and the water commissioner on a monthly basis <br />on a form approved by them. The accounting must be submitted within thirty (30) <br />calendar days of the end of the month for which the accounting is being made. <br />In addition, the applicant shall submit a report from the Town of Milliken ("Milliken"). The <br />report shall include an accounting of al! replacement water controlled by Milliken, <br />showing the total volume of water under its control and the amount committed to each of <br />the recipients of the water. <br />7. The Applicant shall follow the accounting protocol as referenced in the attached <br />document for the operation of this SWSP. <br />8. All diversions shalt be measured in a manner acceptable to the division engineer. The <br />Applicant shall install and maintain such measuring devices as required by the division <br />engineer for operation of this SWSP. <br />9. All releases of replacement water must be sufficient to cover all out of priority depletions <br />and be made under the direction and/or approval of the water commissioner. The <br />replacement may be aggregated to maximize beneficial use. The water commissioner <br />and/or division engineer shall determine the rate and timing of an aggregated release. <br />10. The name, mailing address, and phone number of the contact person who will be <br />responsible for operation and accounting of this plan must be. provided on the <br />accounting forms to the division engineer and water commissioner. <br />11. The approval of this substitute water supply plan does not relieve the Applicant and/or <br />landowner of the requirement to obtain a Water Court decree approving a permanent <br />plan for augmentation or mitigation to ensure the permanent replacement of all <br />depletions, including long-term evaporation losses and lagged depletions after gravel <br />mining operations have ceased. If reclamation of the mine site will produce a <br />permanent water surface exposing groundwater to evaporation, an application for a plan <br />for augmentation must be filed with the Division 1 Water Court at least three (3) years <br />prior to the completion of mining to include, but not be limited to, long-term evaporation <br />losses and lagged depletions. If a lined pond results after reclamation, replacement of <br />lagged depletions shall continue until there is no longer an effect on stream flow. <br />
The URL can be used to link to this page
Your browser does not support the video tag.