Laserfiche WebLink
Page 3/3 <br /> QUARTERLY POND INSPECTION REPORT <br />Operator: Snowca Coal Com an Quarter: Fourth 2004 <br />Permit: C-81-041 Inspection Date: 27-Dec-04 <br /> Sewa a La oons <br />Pond Identification Areation Eva ration Eva ration Eva ration <br />Type of Pond Cell 1 Cell 2 Cell 3 Cell 4 <br />Status During Inspection: Desi nand Actual De th from S illwa Invert <br />Design Depth N/A N/A N/A N/A <br />Design Max Water Depth N/A N/A N/A N/A <br />Design Max Sed. Depth N/A N/A N/A N/A <br />Sediment Level N/A N/A N/A N/A <br />Water Level D D Ice/D Ice <br />Outflow 0 0 0 0 <br />Features Problem Problem Problem Problem <br /> YesMo YesMo YesMo Yes/No <br />Erosional <br />Rills & Gulleys Minor Minor Minor Minor <br />Inadequate Vegetation Yes Yes Yes Yes <br />Outlet Channel Erosion N/A N/A N/A N/A <br />Burrows No Na No No <br />Olher No No No No <br />Structural <br />Differential Settling No No No No <br />Cracks or Slides No No No No <br />Seepage No No No No <br />Other No No No No <br />Appurtenant Structures <br />Defective Spillways N!A N/A N/A N/A <br />Dewatering Devices Clogged N/A N/A N/A N/A <br />Faulty Gates, Etc. N/A N/A N/A N/A <br />Olher No No No No <br />Additional Comments Minor rills noted on the outslopes of the Cells. <br /> Vegetation on Celi outslopes is sparse. <br /> The bottom of the fourth cell was covered with ice. <br />Maintenance Required: Embankment on all Cells needs to be graded to smooth out erosional feet~~w <br /> <br />Maintenance on the Cells will be delayed until v® <br />the sewage treatme~y ~ , ~r~ ~G /Sle <br /> <br />re-activated. <br />Reclamation wilt likely occur before the system is~~~t82>° E. g <br />~ j°® <br />F.p n <br /> ~ ~' : F,' , <br />n ' a <br />q m <br />t <br /> i ~ q/ <br />i <br />~ <br />Name of Inspector: Jim Stover : 7:~ <br /> Stove`r " <br />6 ~ g <br /> i ~0 <br /> rado P. E . 19230.'~9'~~ <br /> <br />.e:.QNAmo ~pv <br />