My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70479
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:36 PM
Creation date
11/20/2007 11:23:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005045
IBM Index Class Name
Permit File
Doc Date
7/1/2005
Doc Name
reclamation costs
From
gravel llc
To
dmg
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul DI O5 01:27p Lisa Carnahan 970-884-7505 p.3 <br /> <br />will be similar to that discussed for phases A, B and C in terms of volume. <br />The average slot dozing distance, however, is estimated to be 300 ft. <br />Material handling of this phase will require only final grading prior to <br />reseeding. <br />The following table details estimated reclamation casts associated with a <br />typical ten-acre mining cell within Phases A,B or C. These phases are the <br />most costly, in terms of reclamation, of the five proposed. It is anticipated <br />that the cost of reclamation of phases D and E will be significantly lower. <br />Descri tion Unit Cost No. of Units Cost <br />Earthmovin <br />Labor $ 20 166 Hrs $ 3,320 <br />Equi ment $ 80 114.4 Hrs 9,150 <br /> <br />Final Gradin <br />Labor $ 20 40 Hrs 80D <br />E ui ment $ 80 20 Hrs 1,600 <br /> <br />Seedin <br />I Labor $ 15 147 Hrs 2,20D <br />E ui ment $ 65 40 Hrs 2,600 <br />Material Seed $ 1.50 300 Lbs 450 <br /> <br />Indirect Costs ------------ ------------ 1 350 <br /> <br /> $21,020 TOTA! <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.