Laserfiche WebLink
03-29-95 OB:I,.I. AM TO 303 832 8106 <br />"EXHIBIT D" - (con't) <br />RECLAMATION PLAN <br />Using this plan will make the reclaimed land of subject site <br />superior to that of neighboring lands. <br />Execution of this reclamation plan is estimated to be <br />53,500.00. Most of the cost will be in the grading and preparation <br />for re-vegetation. Materials necessary for accomplishment are on <br />site and little dry surface area will be affected. Operator will <br />keep the banks of the bond at not steeper than a 3:1 ratio during <br />mining operations. This will minimize need for much work on banks <br />of pond at time of reclamation. <br />This Reclamation Plan will be completed 120 days after <br />termination of mining operations at the Thomeczek Pit. <br />-2- <br />POB <br /> <br />