Laserfiche WebLink
Dis8osal of Excess Sgoil <br />As discussed under the heading of Production Methods and Equipment in <br />Section 2.05.3, Colowyo has constructed an overburden disposal structure <br />known as Streeter Fill. During the early operation, overburden had to <br />be placed into the Streeter Fill so that sufficient working area could <br />be developed prior to the placement of subsequent overburden into the <br />mined-out areas. <br />Additional information concerning the Streeter Fill is set forth in <br />Exhibit 12, Experimental Practice Information. In the initial five year <br />permit term, the Streeter Fill was permitted as an Experimental Practice. <br />In 1986, the Experimental Practice designation was terminated. However, <br />in the interest of continuity, information regarding Streeter Fill is <br />still located in the Experimental Practice Section. <br />Two additional pits will be developed within the permit boundary at <br />Colowyo. One of the pits will be developed in Sections 15 and 16, south <br />of the existing operation and the other pit, defined as the West Pit, <br />• will be developed in Section 4. <br />• 2 . 0 5 - 3 5 FiBVb1011 Sub~ItlBd ~~ V C,. ?y <br />-~. TR-~y <br />