Laserfiche WebLink
~. <br />~I I I I~ ~ I~ ~ I~~~~~ ~I~ <br />999 <br />QUARTERLY POND INSPECTION REPORT <br />i <br />PERATOR: HONEYWOOD COAL CO. QUARTER: THIRD QUARTER 1993 <br />INE: HAMILTON MINE DATE OF INSPECTION: OCTOBER 5, 1993 <br />POND IDENTIFICATION A B <br />YPE OF POND SEDIMENT SEDIMENT <br />STATUS DURING INSPECTION: <br />PPROXIMATE WATER LEVEL DRY DRY <br />ED ($ total storage) 0$ 0$ <br />UTFLOW (cfs) 0 0 <br />FEATURES PROBLEM PROBLEM COMMENTS <br />EROSIONAL: YES NO YES NO <br />Rills & Gulleys X X RILLS ON POND BANK <br />Inadequate Vegetation X X SEE NOTE BELOW <br />outlet Channel Erosion X X <br />Burrows X X <br />Other X X <br />STRUCTURAL: <br />Differential Settling X X <br />Cracks or Slides X X <br />Seepage X X <br />Other X X <br />PPURTENANT STRUCTURES: <br />Defective Spillways X X <br />Dewater Device Clogged X X <br />Faulty Gates, Etc. X X <br />Other X X <br />DDITIONAL COMMENTS: Ponds were built during the first quarter of 1992. <br />Seeding of the pond embankments will occur during the fall of 1993. <br />INTENANCE REQUIRED: Rill repair required at the ditch inlet from <br />access road, rill in pond bank near topsoil pile <br />and riprap repair on east inlet channel. <br />STORM WATER MANAGEMENT PLAN: The silt fences along the haul road were <br />in good shape. <br />AME OF INSPECTOR: Kirt Jewkes ~ ~~ ~ ~~- -~ <br /> E. Stover <br />C <br /> olorado P.E. 19230 <br />