Laserfiche WebLink
<br />C~ <br /> <br />Figure 2. Looking toward the south bank of existing Pond Y-I (Proposed Pond 013) <br />Sediment Pond 012 'dote tension cracks in center of picture. Cracks apparently formed <br />on slightly over-steepened soil slope. Reducing the slope when the pond is built can solve <br />this problem. <br />