Laserfiche WebLink
January 11, 2006 <br />Russell Ranch General Partnership <br />Russell Ranch Pit <br />Exhibit "D" <br />RECLAMATION PLAN <br />a) When gravel is removed to desirable level with 2:1 back slopes, 6" of topsoil <br />will be replaced on slopes and seeded. <br />b) All back slopes upon reclamation will be graded not steeper 2:1. <br />c) All reseeding procedures to be done on the recommendation of Soil <br />Conservation District. See exhibit "D" reclamation plans for the proposed <br />back slope locations. <br />d) Road for entry to pit area will be left after end of operations. <br />e) All above ground improvements such as buildings, scales, and to be removed <br />upon completion of mining operation. <br />~ Cost Estimate -Reclamation <br />1) Grading of back slopes 2000 cu. Yds. @1.20/yd. <br />2) Replacement of 6' topsoi16000 cu. Yds @ 1.50/yd <br />3) Seed 14.61bs. /acre (146 pound) @3.41 /pound <br />4) Planting -includes drill & harrow <br />5) Misc, cleanup <br />6) Total <br />_ $ 2400 <br />_$ 9000 <br />_$ 498 <br />_$ 1000 <br />_$ 1000 <br />$13898 <br />