My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70416
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:34 PM
Creation date
11/20/2007 11:21:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977546
IBM Index Class Name
Permit File
Doc Date
3/3/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ cost (S) <br />Subtotal (K ): <br />L. DRILL HOLE/MONITORING NELL SEALING <br />Task No.~ Task Description ~ Cost (E) <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.l Task Description ~ Cost (S) <br />2 ~ Demob ti onDispose of 5'x5'x10' mass a E0.22/c.f. ~ E85 <br />3 ~ Seeding As per attached worksheet ~ f761 <br />Fencing <br />4 ~ Mob/Demob As per attached worksheet I E896 <br />Subtotal (M ): E1, 712 <br />____________ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E2, 262 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (E) <br />________I_____________~___,.__„_____________________________I____________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ E35 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ E35 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 8226 <br />4. ~ Job Superi ntendent.,Equip. oiler. serves as super. <br />Subtotal (A ): 5296 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E2,558 <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.l Item Description ~ Cost (E) <br />________I______~___~__.,____________________________________I____________ <br />1. ~ Minerals Program Admin. Fee aT 5.00% of cntr.~ $128 <br />NET INDIRECT COST PERCENTAGE: 18.76% Subiot al (B): E128 <br />__ __ __ ____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E424 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 52,686 <br />
The URL can be used to link to this page
Your browser does not support the video tag.