Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Identification <br />During Inspection: <br />mate Water Level <br />nt (% total storage) <br />(cfs) <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Comments <br />Required: <br />oflnspector: Jim Stover <br />Lodestar Ener ,Inc. Quarter: <br />McClave Can on Mine C-80-004 Inspection <br />Full D /Dam D D <br />0% 0% 0% 0% <br />0 0 0 0 <br />No I No <br />Operator finished cleaning sediment from Sediment Pond and flattened the inside <br />slopes during the quaver. SAE 2 and SAE 3 were reshaped during the <br />quarter. <br />None ss0p'RfG/S~s <br />eegP°,°.~... ~lf.• <br />~O,°S STs,9• <br />~.. ~. ~~ ° KGs <br />+tV s? S • <br />~ °~ tit'~`Q `~l <br />• o / ! ~I ~s4• i~ <br />Date <br />