Laserfiche WebLink
-3- <br /> <br />• <br />TABLE OF CONTENTS, CONT. <br />RULE NO. DESCRIPTION VOL. TAB PAGE <br />2.05.3 (6) Overburden I 2.05.3 (6) i-7 <br />2.05.3 (7) Coal Handling Structures I 2.05.3 (7) 1-3 <br />2.05.3 (8) Coal Processing Waste and Non- I 2.05.3 (8) 1 <br /> Coal Processing Waste <br />2.05.3 (10) Return of Coal Processing I 2.05.3 (10) 1 <br /> Waste to Abandoned Morkings <br />2.05.4 Reclamation Plan I 2.05.4 1 <br />2.05.4(2}(a) Timetables I 2.05.4(2)(a) 1-2 <br />2.05.4(2)(b) Reclawtion Cost Estimate I 2.05.4(2)(b) 'i-2 <br />2.05.4{2)(c) 8ackfilling and Grading I 2.05.4(2)(c) i-3 <br />2.05.4(2)(d) Topsoil (Redistribution) I 2.05.4(2)(d) 1-2 <br />2.05.4(2)(e) Revegetation I 2.05.4(2)(s) 1-2 <br />2.05.4(2)(f) Disposal of Debris, Acid Fors- I 2.05.4(2)(f) 1 <br /> ing 8 Toxlc Forsing Materials <br />2.05.4(2)(8) Sealing or Managing Mine Open- I 2.05.4(2)(8) 1 <br /> ings, Exploration Holes, Other <br /> Boreholes or Wells <br />2.05.5 Post-Mining Land Use I 2.05.5 1 <br />2.05.6 Mitigation of the Impacts of I 2.05.8 1 <br /> Mining Operations <br />2.05.6(1) Air Pollution Control Plan I 2.05.6(1) 1 <br />2.05.6(2) Fish and Wildlife Plan I 2.05.6(2) 1 <br />2.05.6.3 Probable Hydrologic Consequence I 2.05.8.3 1-7 <br />2.05.6.3.1 Groundwater <br />I 2.05.6.3 1 <br />2.05.8.3.1.1 0uantity I 2.05.8.3 1 <br />Rev. 05/11/90 <br />