Laserfiche WebLink
~~ <br />Page 2 <br />Mr. Robert W. Shields <br />January 3, 1980 <br />c. The mining plan map states only 109 acres will be mined instead <br />of the 170 acres mentioned, which is correct? <br />3. Plant Operation <br />a. Does the applicant have sufficient water rights to provide all <br />water needs for the mining operation? <br />b. Will the crushers and batch mixing plant be moved periodically? <br />4. Roads and Traffic <br />a. Will any haul roads be constructed beyond the affected land bound- <br />aries? <br />C. Exhibit E - Reclamation Plan <br />1. General <br />a. Reclamation map shows 3:1 and 5:1 slopes while this section specifies <br />4:1, which is correct? <br />b. How many acres is the "practical size area" for grass seeding? <br />2. Topsoil <br />a. How many inches of topsoil will be replaced on areas not needing <br />fill? <br />b. How many inches of material will be spread on low lying areas? <br />c. The operator needs to contact the U.S. Army Corps of Engineers to <br />determine if a 404 Dredge and Fill Permit is required. The office <br />handling your area is: <br />U.S. Army Corps of Engineers <br />6014 U.S. Post Office & Court House <br />215 N. 17th St. <br />Omaha, Nebraska 68102 <br />3. Trees, Shrubs and Grass <br />a. How many feet of ground will be left undisturbed between the river <br />and the mining activity and the canal and the mining activity? <br />