Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 03a <br />Date : OS/f0/2006 <br />User : GRM <br />Permitfjob# : M-2006-027 <br />Abbreviation :none <br />Filename : M027-03a <br />Agency or organization name : DRMS <br />Permit or olherjob action :Initial Reclamation Liability Estimate - 2006 <br />Task description :push topsoil over 1.5 acres <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R DS Series II - 7SU Horsepower : _ _2.40_ <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : i per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG} <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $47.67 NA <br />Operating cosUhour : $54.13 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $134.58 Total fleet cost/hour : $134.58 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,525 LCY factor : NA volume : 4,525 LCY <br />Source of estimated volume :Reclamation <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,022.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % (neg) <br />Average site altitude : 5, 500 feet <br />Material weight : 2, 550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB 71ME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost: $0.293 /LCY <br />Slate :Colorado <br />County :Delta <br />Site :Wells Pit <br />Plan, 4" Topsoil over 1.5 acres <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.J <br />Material consistency : 1.00 (Cat HH) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshift/dayJ <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.00 (Caf H_B) _ <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/Uj <br />Net correction : 0.45 <br />Adjusted unit production : 458.81 LCY/hr <br />Adjusted fleet production : 458.81 LCY/hr <br />Total job time : 9.86 Hours <br />Total job cost : $1,327 <br />