Laserfiche WebLink
PART I <br />Page 7 <br />Permit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIRE"IENTS <br />2. Seormwaeer Manaeemenc Plan (continued) <br />In the areas of coal mining tacilities dirzcciv regulated by effluent <br />limitations, it is zxoectzd that, through actions directzd ac <br />achieving compl?ante with these limitations, the permictee will <br />2LfeC CL`/2 i'J control most site scormwater discharges. However, in <br />other areas, this may not be the case. Some of the discharges are <br />outside the coverage of the diversion ditches and sedimentation ponds <br />required under the tacilicy's Colorado Mined Land Reclamation Division <br />(CMLRD) permit. E:camoles of such areas are roads and railroad Lines <br />used for transportation co and from the site, oucsLopes of ponds, <br />inactive loadouts, sites used for storage and maincznance of material <br />handling equipment and areas grantzd small area exempcior.s, <br />The plan shall describe all areas chat have not been previously <br />permitted, but meet the definition of a scormwatzr discharge in 40 CFR <br />i2Z.26, and shall include a map (or maps) denoting the affecr_ed <br />areas. The map(s) shall show the location of the discharge(s) or <br />drainage areas and indicate the rzceiving waters. The map(s) shall <br />label each scormwacer oucfall with a three digit number beginning with <br />the next number after the last number assigned to surface runoff <br />oucfaLls. <br />The plan shall describe the controls and/or procedures *_hac <br />specifically address the goal of minimizing or eLimir.acing the <br />pollution from these scurces. T_n some cases, this may zntaii <br />consCruction of physical facilities. In other cases, it may entail <br />developing new methods of operation or material handling and/or <br />replacement of matzrials with those chat are less polluting. The <br />permittee shall make the appropriate determinations and receive the <br />appropriate approvals from the CMLRD. <br />Where necessary, the plan shall include a schedule of activities <br />and/or construction with a reasonable timetable for imoLementation of <br />any new operations or construction of new facilities necessar;: co <br />achieve the required goals. The timetable shall allow for actainmenc <br />of operational 1zve1 as expzdiencl'J as possible. but in no ..ase aftzr <br />June 30. 19°5, in conformance with Par[ 402(pj(4)(A) of the Federal <br />Clean Water Act. The Division wii'_ ensure that no proposzd timecablz <br />is escessivel? lengthy. <br />specif_c Reeuiremencs: <br />a) A copy of the plan shall be kept on-sicz ana shah be readil•; <br />available to ail personnel involved with compliance '.:ith tae plan. <br />b) The plan shall contain a statement of certification, signed 'ov cop <br />management, supporting compliance with the stated ~oais. <br />c) Records pertaining co impiemencation of cne plan shall 'oe ~r:eut :n <br />a log and ;na de svaiiabie on request rp DivLSion, C:4 L.:D and cPA <br />:eoresea[aci~~es ;see ?arc i.':: -.;. <br />