Laserfiche WebLink
<br />-4- <br />RIDER TO MINING PERMIT ,AM ~~ <br />~.~~ \1 <br />• Z <br />Permit Date: August 27 1985 SEP <br />Permit Number: M-85-026 <br />IvM1NE' <br />Operator: Challenger Gravel Pit Partnership FiECLAMAT <br />ADDITIONAL STIPULATIONS <br />The following additional stipulations form an integral par <br />captioned permit: <br />Mining may not proceed within 200 feet of the Big Thompson Ri <br />at the Southern portion of Phase II until an engineering report i <br />approved by this Division which shows that the proposed excavation <br />of the Southern part of Phase II will not significantly impact ups <br />and downstream sections of the Big Thompson River. <br />ACCEPTED AND AGREED: <br />By <br />/m <br />Doc. No. 1858 <br />(Rev. 4/84) <br />MINED LAND RECLAMATION BOARI <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />// r <br />. ~^ <br />vision Director <br />l~ti.' <br />ILAND <br />nN Di~iS10N <br />of the <br />