Cont.- Land Recla• ion Board • Page 5 <br />Application for Permit to Operate Open Mining <br />11. Size in acres of the area or areas to be worked at any <br />one time by Applicant: <br />Parcel 1 - Stockpile dnd Processing Area, encompasses <br />32.78 acres by the leg~j description in Item 3 above, <br />however, only 22.50 acres will be affected by <br />stockpiling and processing activities in this area, <br />including the space needed for haul roads. No Open <br />Mining is planned for this area, but the area will <br />eventually be terraced for building sites. This area <br />will be used continuously in varying degree of activity <br />as a support facility for the open mining operation <br />in the Parcel 2 - Extraction Area.=~'.-.:~~ <br />Parcel 2 - Extraction Area, which encompasses 42.94 acres <br />by the legal description in Item 3 above, is scheduled <br />for the orderly reduction of fhe surface in various size <br />sections to accommodate practical quarry procedures. <br />No specific alloted time has been determined for working <br />any particular section, nor will the size of any section <br />remain constant. The normal size of any section to be <br />worked at any one time is approximately 4 acres or less. <br />12. Set out a time table giving the periods of time which will <br />be required for the various stages of operation: <br />The object of this operation is to provide terraces suitable <br />for building sites. Exhibit B, an attached part of this <br />application and refered to in Item I3-a „ indicates the <br />contemplated size and shape of the terraces proposed for <br />the entire project, including those within but not limited <br />to, Parcel - 1 Stockpile and Processing Area and Parcel -2 <br />Extraction Area Phase 1. Terracing of Parcel - I will <br />not be completed until extraction has been completed in <br />Parcel - 2 Extraction Area Phase 1 and subsequent adjacent <br />open mining operations, and there is no longer a need <br />for stockpiling and processing facilities. The following <br />timetable indicates the anticipated completion dates <br />for the terraces, roads, and highwalls within Parcel -2 <br />Extraction Area Phase 1; <br />Terrace No. 3 and part of West Highwall Dec. 1, 1975 <br />Terrace No. 2 and part of Roads Dec. 1, 1976 <br />Terrace No. 1, balance of Roads, balance <br />of West Highwall, and the Highwalls <br />between terraces July 1, 1978 <br />