Laserfiche WebLink
• RESPONSE Continued (2.05.5) <br />The design, construction, and maintenance of structures will <br />achieve the minimum design requirements applicable to structures <br />constructed and maintained under the Watershed Protection and <br />Flood Prevention Pub. Act, I, 83-566 (16 U.S.C. 100 b) and Of- <br />fice of the State Engineer. <br />There are no impoundments planned with a capacity of 1000 acre- <br />feet or more or having a dam or embankment in excess of 10 feet <br />in vertical height from the bottom of the channel to the bottom <br />of the spillway, or having a surface area at high waterline in <br />excess of 20 acres. <br />• EXCERPT FROM THE LAW <br />' (f) The size of tqe impoundment is adequate for its <br />intended purposes; and <br />RESPONSE <br />' The size of the permanent stock watering ponds will be adequate <br />for the post-mining land use of grazing and wildlife use. <br />EXCERPT FROM THE LAW <br />(g) The impoundment will be suitable for the approved <br />post-mining land use. <br /> <br />