Laserfiche WebLink
~ ` III IIIIIIIIIIIIIIII <br />EXHIBIT "H" <br />Ae suggested by the Mined Land Reclamation <br />staff, the following changes Sn seed mixtures <br />are made, and Exhibit "E" Sn all of the applications <br />are changed accordingly: <br />Pits 1, 2, 5, and 6 shall use the following seed <br />mixture per acre: <br />Blue Grams 1 pound <br />Crested ~•Theat Grass 6 a. pounds <br />Yellow Sweet Clover 1 pound <br />Estimated cost per acre is $14.00 <br />Plt number 3 shall r~main_ unchaged. <br />ESTIr1ATED RECLAI+IATION COSTS <br />Pit No. 1 <br />D6 Dozer, 16 hours ® $13.50 <br />Blade 8 hours @ 12.00 <br />Labor to reseed, 4 hours® $5. <br />Operators, 24 hours @ X5.82 <br />Material for 2 acres @ X14.00 <br />TOTAL pit No. <br />216.00 <br />96.00 <br />51 22.04 <br />13y.68 <br />28.00 <br />1 501.72 <br />Pit No 2 <br />D6 Dozer, 24 hours @ $13.50 $324.00 <br />Blade, 12 hoars ® 12.00 144.00 <br />Labor to reseed, 8 hours ® 5.51 44.08 <br />Operators, 36 hours ® $5.82 209.52 <br />I4aterlal for 7 acres @ 14.00 _ 98.00_ <br />TOTAL pit No. 2 ~819.b0 <br />Plt No. 3 <br />Dozer 24 hours @ 13.50 $924.00 <br />Blade 16 hours @ 12.00 192.00 <br />Labor to reseed, 8 hours ® 5.51 44.08 <br />20 Yds. topsoil @ $ .70 175.00 <br />Operators, 40 hours @ $$.82 232.80 <br />Material for 7 acres @ $17.00 119.00 <br />TOTAL wit No. 3 10 .8 <br />Pit No. rj <br />D6 Dozer, 40 hours @ 13.50 <br />Blade 24 hours @ 12.00 <br />966 Loader, 16 hoars ® 18.75 <br />Labor to reseed, 6 hours ® $5 <br />Operators, 80 ho>>rs @ 5.82 <br />Pdaterlal for 3 acres @ 14.00 <br />TOTAL ~St No. <br />$540.00 <br />288.00 <br />300.00 <br />•51 39.06 <br />465.00 <br />42.00 <br />5 1 8. <br />-1- <br />