Laserfiche WebLink
~~~ <br />• Mr. Brent Anderson <br />Page Three <br />October I, I990 <br />IMPROVING DRAINAGE AT THE TOE Of THE SLIDE <br />Providing effective drainage at the toe of the slide would help to prevent <br />any buildup of significant pore pressures within the slide. At present, <br />the open drainage ditch at the toe of the slide serves this purpose <br />adequately. However, the drainage ditch also carries runoff from the road <br />and upgradient areas across the toe of the slide and could result in; <br />erosion of the toe. Maintaining a stable tae is important to assuring <br />overall stability of the currently stable slide mass. <br />Two measures for improving toe conditions are recommended. First, a Swale <br />should be constructed across the road above the slide. This Swale would. <br />intercept all up gradient cut side drainage and divert it to the existing i <br />drainage ditch on the fill side of the roads= This would minimize erosion <br />of the toe of the slope. Second, a 2' x 2' rock drain wrapped in filter. <br />fabric should be constructed across the -toe- of__ihe slide. __The drain.=` i <br />should be constructed by excavating _a trench at the toe of the-slide wifh p <br />a backhoe, installing filter fabric and drain materials in the trench, and ~ ` <br />recovering the .trench,._Thi_s would insure adequate drainage at,the toe,of` <br />- -- - <br />the slide regardless of natural sedimentation or any additional minor,:' <br />movements of slide material. 'The attached figure shows a cross section of `" <br />• the proposed drain. <br />INSTALLING A TOE BUTTRESS <br />In a previous report dated IO/23/85, ACZ recommended installation of a toe <br />buttress in this area. Construction of the toe buttress was deferred <br />pending development and implementation of stability monitoring measures. <br />At- tfiis time it-appears-that-a,large toe buttress is unnecessary as the ~ ~. <br />slide-has stabilized itself above the"road.; The current configuration`' j' <br />would provide the best alternative for long term use of the road. <br />Therefore, at this time a small buttress.,of dimensions _approximately_2'~ _ <br />high x 3' wide is recommended. The purpose_of_~ths.buttress is more_to._- <br />provide cover and protection for the drain at the toe of the slide than to:- <br />add weight to the toe. <br />ANNUAL INSPECTIONS <br />The slide area should be inspected annually for the next five years by a -? <br />competent professional. Annual inspections would provide a record of the <br />conditions of the area as well as give timely warning of any changes in <br />stability. <br />Very truly yours, <br />ACZ INC. <br />• C~~ ~~~ <br />Conrad H. Parrish <br />Colorado PE 17932 <br />CHP:rce <br />attachment <br />