Laserfiche WebLink
PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME: Michael Altavilla DATE: __12 /04/95 <br />NPDES I.D. NO.: CO-0000221 D. P. 009 <br />FACILITY CONFIGUR ATION: Coss-Valley Pond DATE LAST INSPECTION: 09/25 /95 <br />SITE NAME: P~ld # 009 LOCATION: SEi: SWY, Sec. 11. TSN. R88W <br />MINE NAME: Seneca II-W Mine (Seneca Coal Col LOCATION: 8 mi. S of Hayden. CO <br />MINE I.D. NO.: CM LRD Permit No. C-82-057 OWNER'S REP.: Scott Williams. Gen Mor <br />Circle or write in anorooriate reanonse <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7. <br />8. <br />9. <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />Foundation preparation (removal of vegetation, stumps, topsoil: Yes No N/A <br />Lift thickness: ~2 in. N/A <br />Compaction according to approved plan: es No N A <br />Burning (specify extent and location): Yes No /A <br />Angle of slope: 3:1 upstream, 3:1 downstream Total = 6:1 N/A <br />*Seepage (specify location, color, and approximate volume) <br />From underdrain pipes: <br />At isolated points on embankment elopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />Cracks or scarps on crest: <br />Cracks or scarps on slope: <br />Sloughing or bulging on slope: <br />*Maj or erosion problems: Y <br />Surface movements in valley bottom or on hillside: <br />*Erosion of toe: Y <br />*Water impounded against toe: Y <br />Existing embankment freeboard: Ao oroximately <br />X Increase Decrease in water level: <br />Cracks, bulging, or erosion on upstream face: Y <br />Visible sumps or sinkholes in slurry surface: Y <br />*Clogging <br />Yes <br />Yes No N A <br />N A <br />es o N/A <br />es o N/A <br />es o N/A <br />es ~ N/A <br />es ~ N/A <br />es o N/A <br />es o N/A <br />es o N/A <br />es o Y <br />Y <br />Y <br />Y <br />Y <br />Y <br />Y <br />Y <br />N/A <br />es No N/A <br />es N/A <br />10 feet <br />3 feet <br />es ISo N/A <br />es No /A <br />Spillway channels and pipes: Yes <br />Decant system: Yes <br />Diversion ditches: Yes <br />19. *Cracking or crushing of pipes <br />Spillway pipes: Yes <br />Decant system: Yes <br />20. Trash racks clear and in place: es <br />No <br />No <br />©° <br />No N/A <br />No N/A <br />No N/A <br />*Maj or adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />