My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29637
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29637
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:33 PM
Creation date
11/20/2007 11:13:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Hydrology
Doc Date
6/2/1990
Doc Name
ANNUAL INSPECTION OF INDUSTRIAL FACILITY CPDES PN CO-0040754 FOR NATEC MINES RIO BLANCO CNTY
From
CDOH
To
INDUSTRIAL RESOURCES INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?age No. 1 • • <br />)7/02/90 <br />_ Industrial Wastewater <br />In:apection Report <br />iECTION A: NATIONAL DATA SYSTEM CODING <br />Transaction Code CDPS/NPDES Date Inep T~rpe Inspector Fac Type <br />N 5 CO-0090754 06/20/90 C S 2 <br />Fac Rating BI <br />3 N <br />iECTION B: FACILITY DATA <br />1. Legally Responsible Party <br />Mailing Address: ' <br />Business Phone: <br />Emergency Phone: <br />2. Operating Company: <br />Mailing Address: <br />QA County .Operator Plant class <br />52 <br />Industrial Resources Inc. <br />300 Union Blvd. Suite 520 <br />Lakewood CO 80228-0000 <br />(303)625-2495 <br />(303)625-1544 ~Q; -~~~ ~'~`' day ? <br />NaTec Mines, Ltd. ~~ <br />201 W. Third 9t., Suite 101 <br />Rifle CO 81650-0000 <br />Business Phone: )625- <br />Emergency Phone: (303 -1544 <br />3. County in which facility is located: Rio Blanco <br />4. Plant Products: Sodium bicarbonate, Nacholite <br />Present Production Rate: 0 <br />Design Production Rate: Dnknown <br />Raw Materials: Sodium bicarbonate <br />5. Briefly describe the process steps used in producing the product. <br />Include a process flow diagram and a discussion of chemicals used at <br />the site and their final disposition. State the final disposal of <br />wastewater streams. <br />Sodium bicarbonate is Wined from deep wells using <br />airlifts. <br />Runoff is contained in evaporation ponds that have <br />no surface discharge points. Mine water is <br />treated in settling ponds. No coagulants are <br />being used. <br />6. What containment does the permittee have for materials used, procesed <br />or stored on site? <br />Mill onsite is presently under construction. <br />Are additional controls necessary? N <br />Is the Materials Containment Plan adequate? N <br />7. Describe the wastewater treatment processes: <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.