Laserfiche WebLink
<br />ANTICIPATED PRODUCTION <br />It is anticipated that production may reach 610,000 tons per year. <br />OPERATION PLAN -PERMIT AREA <br />MINE FACILITIES <br />SUPPORT FACILITIES <br />n <br />U <br />• <br />The anticipated surface facilities and structures at the King II Mine are <br />depicted on Map King II-007 (Operation Plan and Surface Facilities). The <br />following table identifies each. In general, the mine facilities include the <br />mine bench and portals, offices, maintenance, and shop facilities, <br />infrastructure for supplying power and ventilation to the mine, <br />substation, fuel tanks, water and septic systems, haul and access roads, <br />sediment control systems, stockpiles for topsoil and coal products, and <br />coal sorting and load-out structures. Detailed designs for all structwes <br />with design and certification requirements are located in Appendices 10 <br />and 11. <br />I.D. DESCRIPTION <br />A Executive Offices Parts Wazehouse Bath House Buildin <br />B Electrical Substation - A roximatel 100'-0" x 100'-0" <br />C Sho Buildin <br />D Covered Stora e <br />E Coal Sales Buildin <br />F Office Parkin Area - 14 Cars <br />G Miner Parkin Area - 46 Cars <br />H Fuel Stora a Tanks With S ill Containment Area <br />J Rock Dust Stora a Silo 11' Diameter x 30' Tall <br />K Truck Scales <br />L Se tic S stem Drain Field <br />M Sediment Pond <br />N Bermed To soil Stora e <br />P Water Stora a Tanks on Concrete Pad <br /> Mine Ventilation Fan on Concrete Pad <br />R Rock Stora a Pile <br />S 4" - 8" Lum Coal Pile <br />T Graveled Area for Lum Coal Sales Stora a and General Use <br />U 20 000 Ton Coal Stora a File <br />V Truck Loadout Ho er <br />W LoadoutConve or <br />X Coal Crusher Structure <br />Y Reclaim Conve or <br />National King Coal, LLC <br />Section 2.05.3 <br />Page 3 <br />King II Mine <br />May, 2006 <br />