Laserfiche WebLink
<br />~, III IIIIIIIIIIIII III <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver, CO 60203 <br />303 866-3567 <br />Fnx: 303 832-6106 <br />OF COO <br />~~,.- ~ <br />~~g <br />Nc' <br />~ - r <br />.. ` <br />~ re'16 <br />Roy Romer, <br />Mdy 8, 1991 Governor <br />Fretl R. Banta, <br />Drvieion Drtector <br />Mr. Clifford L: Pridemore <br />Pridemore Construction, Inc <br />County Road No. 256 <br />P.O. Box 317 <br />Poncha Springs, Colorado 81242 <br />Re: M-91-037, Lota Rock Pit, Permit Issuance <br />Dear Mr, Pridemore: <br />On May 3, 1991, the Mined Land Reclamation Division found Pridemore <br />Construction, Inc. to have satisfied the applicable requirements of <br />C.R.S. 34-32-101 et sec for obtaining a mining and reclamation permit. <br />Therefore, a permi$ is being issued: Two signed originals of the permit have <br />been executed. We have kept one copy for our files and are enclosing one copy <br />for your use: Please read the terms of the permit: It is your responsibility <br />to comply with all of the terms of the permit: Asa reminder, here are a few <br />things we feel are important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference: We presume that you have a copy of all of these <br />materials; therefore, none has been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit: <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, May 3, you nest submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />E50:00. Please consult Rule 3:4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Y. <br />Director <br />fRB/DIH/DLM/eke/1939G <br />Enclosure <br />