Laserfiche WebLink
Mr. Tom Schreiner <br />September 25, 2007 <br />Page 2 <br />~~ <br />CIVIL RES~JU RCES,LLC <br />Figure 1 shows the location of the monitoring wells and the groundwater elevations measured during the July <br />sampling event. Groundwater contours have been drawn on the figure also based on these measurements. <br />The hydraulic gradient is generally highest at the southeast corner of the project as it has been in the past. <br />With the dewatering and recharge areas active, there is a sink hole in the gradient at the dewatering site and <br />a mound at both of the recharge sites. This has caused the hydraulic gradient to shift to a more westerly <br />direction at the site. The results of this sampling event are consistent with anticipated results when the <br />GWSAP was developed. Further sampling will be completed in October consistent with the approved <br />GWSAP. <br />Please contact me if you have any questions. <br />Sincerely, <br />CIVIL RESOURCES, LLC. <br />Jos~,~ <br />Civil Engineer <br />J:\DenverVJater151\2007 DMG SamplingUuly07 SamplingUuly07- Itrrpt- FINAL.doc <br />