Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />NUCLEAR DENSITY TEST RESULTS <br />Project: Pond 011 - Yoast Mine Project No.: 97-3000 Date: 9/11197 <br />Report No.: 9 <br />Test <br />Number Location Depth <br />Elevation <br />` Proctor <br />Number Dry <br />Density <br />(Pct Water <br />Content <br />~°/o) Actual <br />Compaction Required <br />Compaction <br /> Center Line of <br /> Top of Dam <br />25 50' NE of Dam 1' BTD 1 112.4 13.6 100 95 <br /> Center <br />26 10' NE of Dam 1' BTD 1 106.4 14.9 95 95 <br /> Center <br />27 25' SW of Dam 1' BTD 1 106.6 14.8 95 95 <br /> Center <br />28 75' SW of Dam 1' BTD 1 102.5 10.1 95 95 <br /> Center <br />Proctor Data: <br />No.: 1 <br />No.: 2 <br />No.: <br />Comments: <br />BSG= <br />SG= <br />SBG= <br />BSBG= <br />BCG= <br />BBF= <br />TOK= <br />Maximum DD: 1,12.3 OMG: 13.0 <br />Maximum DD: 107.5 OMC: 11.0 <br />Maximum DD: ~ OMC: <br />~I <br />Below Subgrade Grade <br />Subgrade Grade <br />Subbase Grade ! <br />Below Subbase Grade <br />Base Course Grade <br />Below Bottom of Footing <br />Top of Keyway <br />Soil Type: Sand & Clay <br />Soil Type: Sand & Clay <br />Soil Type: <br />NWC= Northwest Comer <br />NEC= Northeast Comer <br />SWC= Southwest Comer <br />SEC= Southeast Comer <br />BFG= Below Footing Grade <br />FG= Footing Grade <br />BTD= Below Top of Dam <br /> <br /> <br /> <br /> <br /> <br />