Laserfiche WebLink
III IIIIIIIIIIIII III ~-~ ~~~ ~' <br />999 <br />QUARTERLY SEDIMENTATION POND INSPECTION REPOI~ECEIVED <br />CDMR Rule 4.05.6(13) <br />Yes r/ No <br />Mine: ~g~~,, ~~ /IJr,, ~ Permit No: G - $ Z ' D~j~n of Minerals 8 Geolom~ <br />NPDES ID. ll~ Qp f <br />Inspection Period: 3 ao SCR z o~ o <br />Inspection Date: S~p~-_ 23~op <br />General Description or Reference to Site Plan: <br />t1w {i~.~ re~~,.r~-~ rn <br />R~K Cr.eK /Jfrne, rs ~n f/ead ~re_ ~ ~c.. <br />~rocess. 7Te_ seufrn~reR~'p~t•PM-.2 lies weSf"o~Gts~- /rlr~/e- siGL k..rol <br />of ~ boys ~ a~ ~i- ~e tom'- /r)~~° Jn~~ /9.~ev. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: Celle Moderate Few Poor <br />2). Erosion forming Gullies: Extensive Some Few on <br />3). Is wave action causing erosion: <br /> On the Upstream embankment? Yes No r <br /> At the principal spillway inlet? Yes No ~ <br />4). Erosion of the downstream tae of the embankment? Yes No ~ <br /> Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No c. <br /> Could this seepage cause potential instability? <br /> cu <br />lN A S _Dave <br /> _ <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2):.I~ the' inlet free of debris and restrictive material? <br />3.), Is'ihe,'iiischarge outlet free of restrictive material? <br />4).' Is Brdcion occurring at the discharge outlet? <br />.~ <br />evaluate the severity: Extensive Moderate <br />JAN 2 6 2001 <br />Yes / No <br />Yes ~ <br />Yes <br />Just starting <br />None <br />No <br />No ~ <br />Page 1 of 2 <br />