Laserfiche WebLink
r- <br /> • • <br /> SNOWMASS COAL COMPANY <br /> MINE :INFLOW STUDY <br /> Al MINE <br /> June 10, T985 (*) B July 20, 1985 <br /> Flow Temp Cond pH <br />Area Source GPM ~°C umhos/cm SU <br />*13A Gob 3.0 12.2 1250 7.6 <br />*14 Roof Bolt Holes -2.5 12.5 875 7.8 <br />*15 Gob 5.0 12.5 900 7.7 <br />*16 Roof Bolt Holes 8.5 1.2.8 92:5 7.4 <br />*17 Gob & Roof Bolt Holes 7.5 12.2 7050 7.4 <br />*18 Floor & Rib (Fault) 30.0 12.1 1100 7.4 <br />*19 Roof Bolt Holes i:0 12.5 1200 7.3 <br />*20 Roof Bolt Holes 3.0 12,5 750 7.b <br />~~~~~~ <br />Total Mine inflow = 190.5 G'PM <br />Tota] Mine Discharge = 196.7 GPM <br />Consumption = 0 &PM <br />~. <br />