Laserfiche WebLink
~ji <br />0 <br />,~ , <br />,~,~~ , <br />~, <br />~, <br />,., <br />~- <br />_ TOP OF STANDPIPE ELEV. = 7752.8 <br />"- GATE VALVE INLET ELEV. = 7743.9 <br /> <br />,, <br />:, <br />// <br />~. ~ <br />// <br />i <br />12" CMP OUTLET ELEV. = 7737.9 <br />( a\r <br />7\ <br />i <br />i' <br />/ ' ~ ~, <br />_D_AM. CONSTRUCTION CERTIFICATION <br />\ i j <br />.i I ~, _. . - / i <br />i <br />1 `~ i ~_._. ~. ~ ~~_ __ <br />27 /' <br />~~ ~ <br />- - <br />j <br />-~ 1 <br />_ _ <br />_~ .h -- <br />i <br />---~_ <br />i <br />~~ <br />~~ <br />. % ~~ <br />I, Stephen R. Hinkemeyer, a Registered Engineer in }he State of Colorado. <br />in accordance with 2 CCR 407-2, Section 4.05.6(7), certify that the Section 16 <br />Pond was inspected by me during construction. I certify that the embankments <br />and spillways were built in accordance wi}h the submitted design drawings. <br />Construction of this dam was begun on September 12. 1994 and was completed on <br />November 11, 1994. During construction, }his dam was inspected daily fo insure <br />compliance with prudent construction methods. Compaction was accomplished by <br />laying fill material in thin horizontal layers and compacting with scrapers and <br />a sheepsfoot roller. <br />1\11U111111111//ry7~~ <br />--~ ~- <br />r•~, Hfa'l. ~ Stephen R. Hinkemeyer <br />~ TtM/_:~ Colorado PE No. 25436 <br />25436 ~~ _ ~ rQ ,~.~, ~. 1 ~~ _ <br />. } <br />.•.~!~~ Date <br /> <br />II rT lll_I <br />I <br />i <br />BO77OM OF SPILLWAY ELEV. = 7754.3 <br />~'~a <br />/i/ <br />~~ <br />~/- <br />~ ~ ~, 12" CMP PRIMARY SPILLWAY DISCHARGE <br />.--=" ELEV. = 7714.14 <br />\ EMERGENCY SPILLWAY <br />n r-~. <br />Pe 't N tuber ~ ~~ ~ l ~ ^ <br />Class: OPennit <br />Se_ction_/Exhibit: ._._._._._._._._._._._._.___._._._._._._._._._._._ _, <br />Class O Revision i <br />' Type/Seq <br />--- <br />-- <br />Class: ~ Rep ydro ~G ral ~ <br />_ _ _ ________________ <br />Doc T e; __ __ /[~~l"~ __ ~L _ _ ___ _ <br />. ____YP____-__~_G c <br />17Application (CO ly) O Bond ~ Enforcement ^ Inspection <br />C0110WY0 COA11 CO~PAI~Y 11.1'. <br />' RECEIVED l /~ /~ 9 <br />DEC 0 81994 ~1{'t' ~ll~ 1 U ~)O~~ <br />,F ~ ~~YI~ Clll'I' CO~~TO CRAY <br />I; Division of Minerals & Geology .o,.~ ~a a. <br />GSR/DH 1" = 30' <br />Date: _ Checked: <br />11 Nov. 94 <br />I Illill VIII VIII full VIII VIII IIII IIII <br />006'169 <br /> <br />