Laserfiche WebLink
' _ Pieeance Creek Road '~` E <br />.. . '. ~~ ~ III IIIlIIIIIIIIIIII ~ .. i <br />"EXHIBIT A" <br />WHITE RIVER AGGREGATES PIT <br />The pit is located approximately 2~ miles southeast of lteeker. It is a gravel <br />cap with 2' of silty clay overburden moderately covered with sagebrush and <br />grass. There is no water table in [he pit. <br />The description of the pit is SW'y Section 36, T. 1 N., R, 44 W., 6th P.M., in <br />Rio Blanco, Colorado. (Also see "Exhibit B", map of area) <br />"EXHIBIT B" <br />Hap of Area; Attached <br />NOTE: Includes location map and lab report on pH and conductivity <br />"EXHIBIT C" <br />Mining Plan: <br />(1) Clear and burn sagebrush, <br />(2) Topsoil overburden will be removed and stockpiled for use in final reclamation. <br />(3) It is presumed the sand and gravel will be excavated with front end loader and <br />fed to the contractor's crushing equipment. <br />(4) The excavation will start at the existing face and go south and westerly to a <br />depth not to exceed the present depth of pit. <br />(5) Reclamation of the pit is to be done by White River Aggregates and will consist <br />of grading, placing topsoil and seeding. The monies for this reclamation is <br />a condition of the option between the Department of Highways and White River <br />Aggregates, Inc. Refer to "EXHIBIT L", Option to Buy Materials, Additional <br />Condition No, 4 and No. L0. <br />"EXHIBIT D" <br />Estimated Timetable of Operation: <br />Clearing sagebrush - 1 Day <br />Stockpiling topsoil overburden - 3 Days <br />Excavating and crushing sand 6 gravel - b0 Days <br />Replacing topsoil overburden - <br />Seeding pit area - <br />*See "EXHIBIT C" No. 5 <br />"EXHIBIT E" <br />Wildlife Occurrence <br />Statement requested from the Division of Wildlife 8/13/76, and <br />will be submitted when received. <br /> <br />~' ... <br /> ~ ~ ' <br /> <br /> <br />