My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29548
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29548
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:29 PM
Creation date
11/20/2007 11:05:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Hydrology
Doc Date
5/7/1981
Doc Name
CERTIFICATION OF SEDIMENT PONDS FOR KERR COAL CO
Permit Index Doc Type
Prof Pond Certifications
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE INSPECTION <br />Following review of the design parameters, regular site inspections <br />were conducted to supervise the construction of the embankments and <br />to verify that the various design parameters were being met. The <br />following is a summary of the site inspections: <br />10/3/80 Observe construction methods; Inspect fill material <br />and progress of structures <br />10/4/80 Take samples of fill material from pit; Take samples <br />of fill material from embankments A, B, C, and D for <br />density and moisture determination <br />10/8/80 Check dimensions of principle spillway Embankment C; <br />Check progress of Embankments A, B and D; Take <br />samples for moisture and density tests of Embankment D <br />10/14/80 Inspect Embankment C, B, A, D and E; Take samples for <br />density and moisture determination at Embankment E <br />10/20/80 Inspect Embankments A, B, C, D and E; Check construction <br />methods and constructed dimensions; Take samples from <br />Embankment E for moisture and density determinations <br />10/27/80 Check dimensions of Embankments A, B, C, D and E; <br />Review required changes with George Patterson <br />10/31/80 Check dimensions of Embankments A, B, C, D and E <br />and progress of construction <br />11/21/80 Check final dimensions of Embankments A, B, C, D <br />and E prior to placement of rip rap material; Inspect <br />rip rap material at Sheep Mountain and Willow Creek <br />sites <br />2/27/81 Check final rip rap elevation and placement of rip <br />rap material for Embankments A, B, C, D and E <br />4/25/81 Check final rip rap placement of Embankments A, B, <br />C, D and E. Final inspection <br />Sample Testing and Analysis <br />Samples collected during the site inspections were analyzed to determine <br />the moisture content of the fill material and density of the fill <br />5 A ~ ~ lNC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.