Laserfiche WebLink
PART I <br />Page No. 8 <br />Permit No. CO-0044776 <br />A. DEFINITION OF EFFLUENT LIMITATIONS <br />4. Whole Effluent Toxicity Testing Requirements (Acute) - Outfall 002 (continued) <br />ii. The PTI/TIE results indicate that the toxicant(s) represent pollutant(s) that may be controlled with specific <br />numerical )units, and the Division agrees that the numerical controls are the most appropriate course of <br />action. <br />iii. The PTI/TIE reveals other unique conditions or characteristics which, in the opinion of the Division, justify <br />the incorporation of unanticipated special conditions in the permit. <br />B. MONTI'ORING REQUIREMENTS <br />1. Frequeucy and Sample Type <br />In order to obtain an indication of the probable compliance or noncompliance with the effluent limitations specified <br />in Part I.A.1, the permittee shall monitor all effluent parameters at the following frequencies. Such monitoring will <br />begin immediately and last for the life of the permit unless otherwise noted. The results of such monitoring shall be <br />reported on the Discharge Monitoring Reports (DMR) (see Part I.E.1. for routine reporting requirements). Also see <br />Part I.B.2. for additional monitoring requirements. <br />a. Outfalls 001 and 003 <br />Effluent Parameter Measurement Frequency Sam~tle Type <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />Total Suspended Solids, mg/P Monody Grab <br />Tota] Iron, mglP Monthly Grab <br />Settleable Solids, mP/P Montlily Grab <br />Oil and Grease, mg/P Weekly Visual <br />pH, s.u. Weekly In-situ <br />b. Outfall 002 <br />Effluent Parameter Measurement Frequency Sample Type <br />Flow, MGD Weekly Instantaneous <br /> ' or Continuous <br />Total Suspended Solids, mg/P Montlily Grab <br />Total Iron, mg/P Montlily Grab <br />Settleable Solids, mP/P Monthly Grab <br />Oil and Grease, mg/P Weekly Visual <br />pH, s.u. Weekly In-siru <br />Whole Effluent Toxicity, Acute Quatterly Grab <br />c. Oil and Grease Monit <br />For every outfall with oil and grease monitoring, in the event an oil sheen or Floating oil is observed, a grab <br />sample shall be collected, analyzed, and reported on the appropriate DMR. In addition, corrective action shall <br />be taken itrtmediately to mitigate the discharge of oil and grease. A description of the corrective action taken <br />should be included with the DMR. <br />Self-monitoring sampling by the pettttittee for compliance with the monitoring requirements specified above shall be <br />performed a[ the following locations: ou[falls 001, 002 and 003 -- all after final treatment and prior to entering Deer <br />Trail Ditch. <br />See Part I.C. for Definitions. <br />