Laserfiche WebLink
. <br /> 'h <br />l ~ ,; ~ 4! <br />. <br /> f.i... <br /> <br />• r. '/ yip. '. ~ <br />~, a ~r`, t i ~ •. i ~, ~.~ <br />'~ cry{ six '` `` r i~ L~.. •.~ <br /> . <br /> <br /> f <br />~ <br />` <br /> ENTATION <br />PONp INSPECTIOPl:FORM .. <br />_ • SED#M - , <br /> ) <br />~- Pond w.J ..~~ Df4 . NPDES No , t~oB', <br />Date of InsAection (~/L+~ <br />T r <br />o _ = - <br />w <br />- EMBANKMENT = ~ .: ,• <br />• <br />• <br />~ <br />t. Adequacy of the vegetative cover: Excellent, ode <br />, .. Few, . Poor ; .. <br />• 2. Erosion forming gullies: Extensive, Some, - e~r Few, None <br />3.. Ts wave action causing erosion: • <br />- On the upstream embankment? Yes No v <br />- At the principal spillway inlet? Yes No ~" <br />4. Erosion of the downsveam toe of the embankment? Yes No ~- <br />. The cause of the erosion is attributed to: <br />5. Ls seepage occurring through the dam? Yes No ~" <br />Could this seepage catse potential instability? Yes No <br />Explain: <br />PRINCIPAL SPILLWAY <br />I. is tht principal spillway system in working order? Yes ~" No <br />2. Is tht inlet free of debris and restrictive material? Yes ~' No <br />3. Is tho discharge outle[ free of restrictive material? Yes t'^" No <br />4. Is erosion occurring at the discharge nutlet" Yes No v <br />Evaluate the severity: Extensive Moderate lust Starting Nonc <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge? <br />Yes Lam- No <br />2. Does i[ appear as if the emergency spillway has discharged water since the last inspection? <br />- Yes No C.~- <br />3. Is erosion occurtittg at any section of the emergency spillway? Yes No_~,_ <br />Describe the extent: <br />SEDIMENT STORAGE CAPAGTY <br />1. Has the design storage c ~aactiN of the reservorr been surpassed'? <br />Please add any special comments concetaing pottntiatly dangerous~btem~ back of tiffs <br />sheet! <br />Inspected by: -'~^-" <br />